Ask your AI Coworker anything.
Access real-time insights into every project, from BOQs and budgets to site progress and contractor activities.
Zone 3 rework at Skyline Tower has pushed the concrete BOQ line to 95% — with two pours still to go.
How is Skyline Tower tracking against the BOQ?
Skyline Tower is 74% complete, with BOQ utilisation at 78%.
- Concrete works: S$4.1M of S$4.3M (95%)
- Structural steel: S$2.6M of S$3.4M (76%)
- M&E rough-in: S$0.9M of S$1.5M (59%)
- Concrete works: S$4.1M of S$4.3M (95%)
- Structural steel: S$2.6M of S$3.4M (76%)
- M&E rough-in: S$0.9M of S$1.5M (59%)
At the current pour rate, concrete works will overrun by about S$180k — mostly Zone 3 rework. I can draft variation order VO-112 for client approval.
TitanForm Formwork submitted Claim #4 this morning — it includes rework charges I can't match to an approved variation order.
Which subcontractor claims are due for certification this week?
3 progress claims are pending certification, totalling S$1.24M.
- Leong Hin M&E — Claim #7, S$486k, due 15 Jul
- TitanForm Formwork — Claim #4, S$392k, due 16 Jul
- AsiaGlaze Facade — Claim #2, S$362k, 5% retention
- Leong Hin M&E — Claim #7, S$486k, due 15 Jul
- TitanForm Formwork — Claim #4, S$392k, due 16 Jul
- AsiaGlaze Facade — Claim #2, S$362k, 5% retention
TitanForm's claim includes S$38k of Zone 3 rework with no approved VO. I recommend holding that line until VO-112 is signed.