Ask your AI Coworker anything.
Access real-time insights into every project, from BOQs and budgets to site progress and contractor activities.
Zone 3 rework at One Vertis Tower has pushed the concrete BOQ line to 95% — with two pours still to go.
How is One Vertis Tower tracking against the BOQ?
One Vertis Tower is 74% complete, with BOQ utilization at 78%.
- Concrete works: ₱168M of ₱177M (95%)
- Structural steel: ₱108M of ₱140M (77%)
- M&E rough-in: ₱37M of ₱62M (60%)
- Concrete works: ₱168M of ₱177M (95%)
- Structural steel: ₱108M of ₱140M (77%)
- M&E rough-in: ₱37M of ₱62M (60%)
At the current pour rate, concrete works will overrun by about ₱7.5M — mostly Zone 3 rework. I can draft variation order VO-112 for client approval.
PrimeForm Formwork submitted Billing #4 this morning — it includes rework charges I can't match to an approved variation order.
Which subcontractor billings are due for certification this week?
3 progress billings are pending certification, totaling ₱52M.
- Villanueva M&E — Billing #7, ₱20.4M, due Jul 15
- PrimeForm Formwork — Billing #4, ₱16.6M, due Jul 16
- LuzGlaze Facade — Billing #2, ₱15M, 5% retention
- Villanueva M&E — Billing #7, ₱20.4M, due Jul 15
- PrimeForm Formwork — Billing #4, ₱16.6M, due Jul 16
- LuzGlaze Facade — Billing #2, ₱15M, 5% retention
PrimeForm's billing includes ₱1.6M of Zone 3 rework with no approved VO. I recommend holding that line until VO-112 is signed.