Ask your AI Coworker anything.
Get instant answers about production, inventory, machines, and work orders—powered by your manufacturing data.
Quick heads-up: Line 3 went down at 10:20 AM — material shortage on WO-2041.
How are we tracking against today's plan?
Plan vs actual as of 11:00 AM:
- 🏭 Line 1 — 4,120 / 4,000 units, running ahead
- ⚙️ Line 2 — 2,860 / 3,200 units, changeover overran 25 min
- ⚠️ Line 3 — down since 10:20 AM (WO-2041 material shortage)
- ✅ QC pass rate 98.6% across 9 batches
- 🏭 Line 1 — 4,120 / 4,000 units, running ahead
- ⚙️ Line 2 — 2,860 / 3,200 units, changeover overran 25 min
- ⚠️ Line 3 — down since 10:20 AM (WO-2041 material shortage)
- ✅ QC pass rate 98.6% across 9 batches
Line 2 can close its gap if the 1:00 PM changeover on CNC-04 starts on time — I've already notified the setter.
One order is on a tight schedule this week: WO-2038 for Selatan Pump Engineering.
Which order is most at risk this week?
Work Order WO-2038 — Selatan Pump Engineering
- Product: CP-150 centrifugal pump, 900 units
- Order value: RM1.28 million
- Ship date: Friday, Port Klang cutoff 3:00 PM
- Impeller stock (SKU IM-3302): 640 of 900 on hand
- Balance 260 arriving Wednesday from Kinta Metal Works
- Delay risk: High if the inbound slips
- Product: CP-150 centrifugal pump, 900 units
- Order value: RM1.28 million
- Ship date: Friday, Port Klang cutoff 3:00 PM
- Impeller stock (SKU IM-3302): 640 of 900 on hand
- Balance 260 arriving Wednesday from Kinta Metal Works
- Delay risk: High if the inbound slips
Recommendation: reserve Saturday morning on Line 1 as a buffer and ask Kinta to split the delivery — I can draft both requests now.