Ask your AI Coworker anything.
Access real-time insights into every project, from BOQs and budgets to site progress and contractor activities.
Zone 3 rework at Menara Aspira has pushed the concrete BOQ line to 95% — with two pours still to go.
How is Menara Aspira tracking against the BOQ?
Menara Aspira is 74% complete, with BOQ utilisation at 78%.
- Concrete works: RM12.6M of RM13.2M (95%)
- Structural steel: RM8.1M of RM10.5M (77%)
- M&E rough-in: RM2.8M of RM4.7M (60%)
- Concrete works: RM12.6M of RM13.2M (95%)
- Structural steel: RM8.1M of RM10.5M (77%)
- M&E rough-in: RM2.8M of RM4.7M (60%)
At the current pour rate, concrete works will overrun by about RM560k — mostly Zone 3 rework. I can draft variation order VO-112 for client approval.
BinaForm Formwork submitted Claim #4 this morning — it includes rework charges I can't match to an approved variation order.
Which subcontractor claims are due for certification this week?
3 progress claims are pending certification, totalling RM3.9M.
- Weida M&E — Claim #7, RM1.52M, due 15 Jul
- BinaForm Formwork — Claim #4, RM1.24M, due 16 Jul
- KrisGlaze Facade — Claim #2, RM1.14M, 5% retention
- Weida M&E — Claim #7, RM1.52M, due 15 Jul
- BinaForm Formwork — Claim #4, RM1.24M, due 16 Jul
- KrisGlaze Facade — Claim #2, RM1.14M, 5% retention
BinaForm's claim includes RM118k of Zone 3 rework with no approved VO. I recommend holding that line until VO-112 is signed.