{"id":20406,"date":"2022-08-30T03:42:27","date_gmt":"2022-08-30T03:42:27","guid":{"rendered":"https:\/\/www.hashmicro.com\/blog\/?p=20406"},"modified":"2025-11-20T07:32:44","modified_gmt":"2025-11-20T07:32:44","slug":"common-construction-problems-and-how-software-can-help","status":"publish","type":"post","link":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/","title":{"rendered":"Common Construction Management Problems and How Software Can Help"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Construction derives from the word \u2018construct\u2019. It means \u2018to build\u2019. Thus, construction refers to the process of building something. Meanwhile, in the engineering term, it is often associated with large structures such as buildings, highways, and houses. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Every construction project requires a complicated process which causes companies to struggle to achieve it. Managers are often finding it hard to do multiple tasks. Many aspects are crucial to the process since it needs accuracy. Companies often fail to complete projects due to certain reasons. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">To prevent any human-error leading to failure, companies can utilize<\/span><span style=\"font-weight: 400;\"><a href=\"https:\/\/www.hashmicro.com\/blog\/construction-management-software-singapore\/\"> construction management software<\/a> that<\/span><span style=\"font-weight: 400;\"> will help them simplify complex management phases to boost productivity. It will also reduce the initial cost as these projects often need a big cost. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">By all means, <\/span><span style=\"font-weight: 400;\">a great <a href=\"https:\/\/www.hashmicro.com\/hash-construction-software\">construction software <\/a><\/span><span style=\"font-weight: 400;\">will assist you<\/span><span style=\"font-weight: 400;\"> through the whole operational process. You\u2019ll also need to consider which software is the best for you. The software you choose should be able to adapt with your company. Hence, you can <\/span><span style=\"font-weight: 400;\">use a software <\/span><a href=\"https:\/\/www.hashmicro.com\/grants\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">pricing calculation scheme<\/span><\/a><span style=\"font-weight: 400;\"> for your guideline.<\/span><\/p>\n<div id=\"toc_container\"><\/div>\n<p><span style=\"font-weight: 400;\">In this article, we will go over aspects and issues of construction project. You will also find some of the best construction software to help you manage your projects.\u00a0\u00a0<\/span><\/p>\n<p><strong>Also read: <\/strong><a href=\"https:\/\/www.hashmicro.com\/blog\/erp-for-construction-industry\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">6 Benefits of ERP Software for the Construction Industry<\/span><\/a><\/p>\n<p><a href=\"https:\/\/www.hashmicro.com\/free-product-tour\/?medium=free-product-tour\" target=\"_blank\"><img decoding=\"async\" loading=\"lazy\" width=\"712\" src=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2025\/11\/Free-Product-Tour-resized.webp\" alt=\"Free Demo\"><\/a>\u00a0<!-- <div id=\"toc_group_article\" style=''>\r\n\t<p style='font-size:25px;font-weight:bold; margin-bottom:0px'>\r\n\t\tTable of Content:\r\n\t<\/p>\r\n\t<ul id=\"list_toc\" class='list_toc'><\/ul>\r\n<\/div> -->\r\n\r\n<!-- <div class=\"dropdown-fixed-top\" id=\"dropdown-fixed-top\">\r\n\t<div class=\"row\">\r\n\t\t<p id=\"pilihDaftarIsi\">Table of Content<\/p>\r\n\t\t<p><i class=\"td-icon-menu-down\"><\/i><\/p>\r\n\t<\/div>\r\n\t\r\n\t<div>\r\n\t\t<ul id=\"list_toc_top\" class='list_toc'><\/ul>\r\n\t<\/div>\r\n<\/div> -->\r\n\r\n<div id=\"placeholder-toc\"><\/div>\r\n<div id=\"toc\">\r\n    <div class=\"header\">\r\n\t<span class=\"toc-title\" id=\"toc-title\">Table of Content<\/span>\t\r\n\t <i class=\"toc-icon\">\r\n        <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"30\" height=\"30\" viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"#000\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\" class=\"header-icon\">\r\n          <path d=\"m6 9 6 6 6-6\" \/>\r\n        <\/svg>\r\n      <\/i>\r\n\t<\/div>\r\n    <div class=\"list\">\r\n      <ul id=\"toc-list\"><\/ul>\r\n    <\/div>\r\n <\/div>\r\n\r\n<style>\r\n\t@media (max-width: 992px) {\r\n\t\t#toc_group_article {\r\n\t\t\tpadding-top: 24px;\r\n\t\t}\r\n\t}\r\n\t\r\n\t#list_toc_float {\r\n\t\tmax-height: calc(100vh - 250px);\r\n\t\toverflow-y: auto;\r\n\t}\r\n\t\r\n\t#list_toc_top {\r\n\t\tdisplay: none;\r\n\t\tbackground: #fff;\r\n\t\tmargin-bottom: 4px;\r\n\t}\r\n\t\r\n\t#list_toc_top li {\r\n\t\tdisplay: block;\r\n\t\tmargin-left: 0;\r\n\t\tlist-style: none;\r\n\t}\r\n\t\r\n\t#list_toc_top a {\r\n\t\tpadding: 5px;\r\n\t\tdisplay: block;\r\n\t}\r\n\t\r\n\t#list_toc_top.show {\r\n\t\tdisplay: block;\r\n\t}\r\n\r\n\t#list_toc_top a {\r\n\t\tcolor: #434343;\r\n\t\tborder-bottom: 1px solid #bbb;\r\n\t}\r\n\t\r\n\t.dropdown-fixed-top {\r\n\t\tposition: fixed;\r\n\t\ttop: 59px;\r\n\t\twidth: 100%;\r\n\t\tz-index: 99;\r\n\t\tborder-bottom: 2px solid #9c171e;\r\n\t\tpadding: 12px;\r\n\t\tbackground: #fff;\r\n\t\twidth: 100%;\r\n\t\tcursor: pointer;\r\n\t\tdisplay: none;\r\n\t\tleft: 0;\r\n\t\tbox-shadow: 0 -2px 7px 6px rgba(0, 0, 0, 0.17);\r\n\t}\r\n\t\r\n\t#dropdown-fixed-top.show {\r\n\t\tanimation: showAnim 0.5s ease;\r\n\t\tdisplay: block;\r\n\t\topacity: 1;\r\n\t}\r\n\t\r\n\t@keyframes showAnim {\r\n\t\tfrom {\r\n\t\t\tdisplay: none;\r\n\t\t\topacity: 0;\r\n\t\t}\r\n\t\tto {\r\n\t\t\tdisplay: block;\r\n\t\t\topacity: 1;\r\n\t\t}\r\n\t}\r\n\t\r\n\t.dropdown-fixed-top #list_toc_top {\r\n\t\tmax-height: calc(50vh - 110px);\r\n\t\toverflow-y: scroll;\r\n\t}\r\n\t\r\n\t.dropdown-fixed-top .row {\r\n\t\tdisplay: flex;\r\n\t\tjustify-content: space-between\r\n\t}\r\n\t\r\n\t.dropdown-fixed-top .row p {\r\n\t\tmargin-bottom: 0;\r\n\t}\r\n\t\r\n\t#pilihDaftarIsi {\r\n\t\tmax-width: 100%;\r\n\t\toverflow: hidden;\r\n\t\twhite-space: nowrap;\r\n\t}\r\n\t\r\n\t@media (min-width: 1018px) {\r\n\t\t.dropdown-fixed-top {\r\n\t\t\tdisplay: none;\r\n\t\t}\r\n\t}\r\n\t\r\n\t#list_toc li {margin-bottom: 0;margin-top: 5px;}\r\n\t#list_toc > li > ul {padding-left: 20px;margin-bottom: 0;}\r\n\t#list_toc{height:max-content;transition:ease-in-out}\r\n\t#list_toc li {margin-bottom: 0;margin-top: 5px;}\r\n\t#list_toc_float li.active > a {color:#b1252d;background: #ffe1e3;}\r\n\t#list_toc_top li.active > a {color:#b1252d;background: #ffe1e3;}\r\n\t#list_toc_float li a {padding:3px 7px}\r\n\t#list_toc_float li a {\r\n\t\tdisplay: block;\r\n\t\tcolor: #000;\r\n\t\tmargin-bottom: 6px;\r\n\t\tpadding-top: 2px;\r\n\t\tpadding-bottom: 2px;\r\n\t\ttransition: all 0.2s ease-in-out;\r\n\t\tfont-size: 15px;\r\n\t\tline-height: 18px;\r\n\t}\r\n\t#list_toc_float li{list-style:none;list-style-position:inside; margin-left:0;}\r\n\t#list_toc_float a:hover{color:#b1252d;}\r\n\t\r\n\t#toc_group_float{\r\n\t\tline-height: 24px;\r\n\t\tmax-height: calc(100vh - 100px);\r\n\t\toverflow: auto;\r\n\t\tz-index: 99;\r\n\t\tdisplay:none!important;\r\n\t\tbackground:#fff;\r\n\t\ttransition:all 0.5s linear\r\n\t}\r\n\t\r\n\t@media (min-width:1019px){\r\n\t\t#toc_group_float {\r\n\t\t\tdisplay:block!important;\r\n\t\t\t}\r\n\t\t\t\t#toc_group_article {\r\n\t\t\tdisplay:none;\r\n\t\t}\r\n\t}\r\n\r\n<\/style>\r\n\r\n<!-- ToC styling  -->\r\n<style>\r\n\t\/* Simple styling for the TOC *\/\r\n\t\r\n\t#toc ul li:last-child {\r\n    padding-bottom: 16px; \/* Adjust the value as needed *\/\r\n}\r\n\r\n.td-fix-index {\r\n\t transform: unset !important;\r\n     -webkit-transform: unset !important; \r\n}\r\n.footer-contact .td-fix-index {\r\n\t transform: translateZ(0) !important;\r\n     -webkit-transform: translateZ(0) !important; \r\n}\r\n\t.tdb_single_content .tdb-block-inner.td-fix-index{\r\n\t\tposition: static;\r\n\t}\r\n\t\r\n\r\n\t\r\n#toc {\r\n  background-color: #FFF;\r\n\tpadding: 17px 24px 0px 24px !important;\r\n  margin-bottom: 20px;\r\n\/*   border: 1px solid #9C171E; *\/\r\n  border-radius: 6px;\r\n\tdisplay: none;\r\n  max-width: 100%;\r\n  transition: .4s ease height;\r\n\tmargin-left: 0;\r\n\toverflow: hidden;\r\n}\r\n\r\n#toc .header{\r\n  display: flex;\r\n  align-items: center;\r\n  justify-content: space-between;\r\n\tbackground-color: transparent;\r\n}\r\n\t\r\n\t#toc.sticky .header{\r\n\t\tpadding: 4px 0;\r\n\t}\r\n\t\r\n.header p{\r\n  font-size: 18px !important;\r\n  font-weight: 600 !important;\r\n  color: #393939;\r\n   margin-bottom: 0;\r\n  \/* margin-top: 20px; *\/\r\n}\r\n\r\n.toc-icon{\r\n  float: right;\r\n\/*   visibility: hidden; *\/\r\n}\r\n\r\n\t.toc-title{\r\n\t\tmargin-right: auto;\r\n\/* \t\tpadding-left: 20px; *\/\r\n\t\tfont-weight: 600;\r\n\t\talign-self: center;\t}\t\r\n\r\n#toc ul {\r\n  list-style-type: none;\r\n  padding-left: 0;\r\n}\r\n\t\r\n#toc.sticky ul{\r\n\toverflow-y: auto;\r\n\tmax-height: 250px;\r\n\tmargin-top: 0px;\r\n\tpadding-top: 20px;\r\n\/* \tborder-top: 1px solid #d3d3d3; *\/\r\n}\r\n\t\r\n#toc ul li {\r\n\/*   margin-bottom: 10px; *\/\r\n  margin-bottom: 10px;\r\n\tmargin-left: 0;\r\n\ttransition: .2s ease;\r\n\tcursor: pointer;\r\n}\r\n\t\r\n\t#toc.sticky ul li {\r\n\t  margin-right: 10px;\r\n\t}\r\n\t\r\n.td-post-content #toc-list li a:hover, .td-post-content #toc-list a.active{\r\n\tbackground-color: #FFF;\r\n\/* \tpadding: 8px 16px 8px 16px; *\/\r\n\tpadding: 4px 16px 4px 16px;\r\n\tborder-radius: 6px;\r\n\tcolor: #9c171e !important;\r\n\tfont-weight: 600 !important;\r\n}\r\n\t\r\n\t.td-post-content #toc-list li:hover a, .td-post-content #toc-list a.active{\r\n\t\tcolor: #9C171E !important;\r\n\t\tfont-weight: 600 !important;\r\n\t}\r\n\t\r\n.td-post-content #toc-list a.active{\r\n\tfont-weight: bold !important;\r\n\tcolor: #9C171E !important;\r\n}\r\n\t\r\n#toc a, .td-post-content #toc-list a {\r\n  text-decoration: none;\r\n  color: #ea1717 !important;\r\n  transition: .2s ease;\r\n\tfont-weight: 400 !important;\r\n\tdisplay: block;\r\n\t\r\n\tpadding: 4px 16px 4px 0;\r\n}\r\n\r\n#toc.sticky {\r\n  position: fixed;\r\n\/*   top: 73px; *\/\r\n\tbottom: 0;\r\n  z-index: 100; \r\n  box-shadow: 0 2px 5px rgba(0,0,0,0.1); \r\n\twidth: 100%; \r\n\tbackground-color: #FFF;\r\n\/* \tbackground-color: #FFF1F1; *\/\r\n\tborder-bottom: 1px solid #ea1717;\r\n\/*   border: 1px solid #393939; *\/\r\n  box-shadow: 0px 0px 14px 0px #00000040;\r\n  cursor: pointer;\r\n\tanimation: fadein .3s ease;\r\n\tpadding: 12px 16px !important;\r\n}\r\n\t\r\n\t.fadein{\r\n\t\tanimation: fadein .3s ease;\r\n\t}\r\n\t\r\n\t.fadeout{\r\n\t\tanimation: fadeout .3s ease;\r\n\t}\r\n\t\r\n\t\r\n\t@keyframes fadein{\r\n\t\t0% {\r\n\t\t\topacity: 0;\r\n\t\t}\r\n\t\t100%{\r\n\t\t\topacity: 1;\r\n\t\t}\r\n\t}\r\n\t\r\n\t@keyframes fadeout{\r\n\t\t0% {\r\n\t\t\topacity: 1;\r\n\t\t}\r\n\t\t100%{\r\n\t\t\topacity: 0;\r\n\t\t}\r\n\t}\r\n\r\n\t\r\n#toc.sticky .header p{\r\n\tmargin-bottom: 10px;\r\n\tmargin-top: 10px;\r\n}\r\n\r\n#toc.sticky .toc-icon{\r\n  visibility: visible;\r\n\/* \ttransition: 0.4s ease; *\/\r\n}\r\n\t\r\n\t.toc-icon{\r\n\t\talign-items: center;\r\n    \tdisplay: flex;\r\n\t}\r\n\t\r\n\tsvg.header-icon{\r\n\/* \t\tbackground-color: #9c171e; *\/\r\n\t\tbackground-color: #FFF;\r\n\t\tborder-radius: 30px;\r\n\t\tpadding: 5px;\r\n\t}\r\n\r\n#toc.sticky .list{\r\n\/*   max-height: 0; *\/\r\n  transition: height 0.4s ease;\r\n}\r\n\t\r\n\t#toc .list{\r\n\/*   max-height: 0; *\/\r\n  transition: height 0.4s ease;\r\n}\r\n\r\n#toc .header.active .toc-icon{\r\n\ttransform: rotate(0deg); \r\n\topacity: 1;\r\n}\r\n\r\n\t#toc .header.active + .list {\r\n\t  max-height: 200px; \/* Adjust this value as needed *\/\r\n\t  opacity: 1;\r\n\t}\r\n\t\r\n\t#placeholder-toc{\r\n\/* \t\tdisplay: none; *\/\r\n\t}\r\n\t\r\n\t@media (min-width: 768px) and (max-width: 991px){\r\n\t\t#toc.sticky{\r\n\/* \t\t\ttop: 104px; *\/\r\n\t\t\tbottom: 0px;\r\n\t\t}\r\n\t\t\r\n\t\t#toc{\r\n\t\t\twidth: unset !important;\r\n\t\t}\r\n\t}\r\n\t\r\n\t@media (max-width: 767px){\r\n\t\t#toc{\r\n\t\t\twidth: 100% !important;\r\n\t\t\tdisplay: inline-block;\r\n\t\t}\r\n\t\t\r\n\t\t#toc.sticky{\r\n\t\t\twidth: 90% !important;\r\n\/* \t\t\ttop: 81px; *\/\r\n\t\t\tbottom: 60px;\r\n\t\t\tmargin-left: auto;\r\n\t\t\tmargin-right: auto;\r\n\t\t\tpadding: 0 16px;\r\n\t\t\tright: 5%;\r\n\t\t}\r\n\t}\r\n\t\r\n\t<\/style>\r\n\r\n<!-- ToC List for mobile -->\r\n<script>\r\n \/\/ Generate TOC based on headings\r\ndocument.addEventListener(\"DOMContentLoaded\", function() {\r\n  \/\/ Get the element that will contain the TOC\r\n  const tocList = document.getElementById('toc-list');\r\n\r\n  \/\/ Get the element with the ID 'article-left'\r\n  const article = document.querySelector('.td-post-content');\r\n\r\n  \/\/ Find all h2 elements within 'myarticle'\r\n  const headers = article.getElementsByTagName('h2');\r\n\r\n  \/\/ Loop through the h2 elements and create a list item for each one\r\n  for (let i = 0; i < headers.length; i++) {\r\n    const header = headers[i];\r\n    const headerText = header.textContent;\r\n\/\/     const headerId = 'header-' + i;\r\n    const headerId = headerText\r\n    .toLowerCase()\r\n    .trim()\r\n    .replace(\/[^\\w\\s-]\/g, '')  \/\/ hapus tanda baca\r\n    .replace(\/\\s+\/g, '-'); \/\/ ganti spasi jadi \"-\"\r\n\r\n    \/\/ Set an ID for the header if it doesn't have one\r\n    header.setAttribute('id', headerId);\r\n\r\n    \/\/ Create a list item for the TOC\r\n    const listItem = document.createElement('li');\r\n\r\n    \/\/ Create a link for the list item\r\n    const link = document.createElement('a');\r\n    link.setAttribute('href', '#' + headerId);\r\n    link.textContent = headerText;\r\n\r\n    \/\/ Append the link to the list item\r\n    listItem.appendChild(link);\r\n\r\n    \/\/ Append the list item to the TOC list\r\n    tocList.appendChild(listItem);\r\n  }\r\n});\r\n\r\n\/\/ Keep height and placement of content using placeholder in place of TOC\r\ndocument.addEventListener(\"DOMContentLoaded\", function() {\r\n  const toc = document.querySelector('#toc');\r\n  const placeholderToc = document.querySelector('#placeholder-toc');\r\n\r\n  function setPlaceholderHeight() {\r\n    placeholderToc.style.height = `${toc.offsetHeight}px`;\r\n  }\r\n\r\n  \/\/ Set the initial height of the placeholder\r\n  setPlaceholderHeight();\r\n\r\n  \/\/ Update the height on window resize\r\n  window.addEventListener('resize', setPlaceholderHeight);\r\n});\r\n  const tocTitle = document.querySelector('#toc-title'); \/\/ Assuming header-faq is the element for TOC title\r\n\r\n\/\/ Sticky TOC and update heading\r\ndocument.addEventListener(\"DOMContentLoaded\", function() {\r\n  const toc = document.querySelector('#toc');\r\n  const footer = document.querySelector('.td-footer-template-wrap');\r\n  const tocParent = toc.parentElement;\r\n  const divTop = tocParent.getBoundingClientRect().top + window.pageYOffset;\r\n  const tocHeight = toc.offsetHeight;\r\n  const triggerPoint = divTop + tocHeight + 700;\r\n  const footerHeight = footer.offsetHeight;\r\n  const triggerFooterPoint = footer.getBoundingClientRect().top + window.pageYOffset - footerHeight - footerHeight - footerHeight;\r\n  const phtoc = document.querySelector('#placeholder-toc');\r\n  const headers = document.querySelectorAll('.td-post-content h2');\r\n  const navLinks = document.querySelectorAll('#toc-list a');\r\n\t\r\n\tconst panel2 = document.querySelector(\"#toc .list\");\r\n\tvar icon = document.querySelector(\".toc-icon\");\r\n\r\n  let activeLink = null; \/\/ Declare activeLink outside the loop\r\n\t\r\n  \/\/ Function to handle scroll and add\/remove .sticky class\r\n  function handleScroll() {\r\n    const windowTop = window.pageYOffset || document.documentElement.scrollTop;\r\n    let currentHeader = '';\r\n\r\n    \/\/ Highlight user progress as the heading comes\r\n    headers.forEach(header => {\r\n\t\tconst headerTop = header.offsetTop;\r\n\t\tconst headerHeight = header.clientHeight;\r\n\t\tif (window.scrollY >= (headerTop - headerHeight + 700)) {\r\n\t\t\tconst currentHeaderId = header.getAttribute('id');\r\n\t\t\tconst currentHeaderText = document.getElementById(currentHeaderId).textContent;\r\n\/\/ \t\t\tconsole.log(\"current header text:\", currentHeaderText);\r\n\t\t\ttocTitle.textContent = currentHeaderText;\r\n\t\t\tcurrentHeader = currentHeaderId;\r\n\t\t\t\r\n\t\t\tif(window.innerWidth < 767){\r\n\t\t\t\ttocTitle.textContent = 'Table of Content';\r\n\t\t\t}\r\n\t\t}\r\n\t});\r\n\r\n    navLinks.forEach(link => {\r\n      link.classList.remove('active');\r\n      if(currentHeader != '') {\r\n\t\t  if (link.getAttribute('href').includes(currentHeader)) {\r\n\t\t\t  link.classList.add('active');\r\n\t\t  }\r\n\t  }\r\n    });\r\n\/\/     if (windowTop < triggerFooterPoint) {\r\n\/\/         toc.style.display = 'block';\r\n\/\/ \t}else{\r\n\/\/         toc.style.display = 'none';\r\n\/\/ \t}\r\n    \/\/ Update TOC title if sticky\r\n    if (windowTop > triggerPoint) {\r\n      if (!toc.classList.contains('sticky')) {\r\n        phtoc.style.display = \"block\";\r\n        toc.classList.add('sticky');\r\n        toc.style.width = `${tocParent.offsetWidth}px`; \/\/ Set width to match the parent element\r\n        toc.setAttribute('style', 'width: ' + tocParent.offsetWidth + 'px !important;');\r\n        toc.style.backgroundColor = \"#FFF\";\r\n\t\tpanel2.style.height = '0px';\r\n\t\t  icon.style.transform = \"rotate(180deg)\";\r\n\t\t  if(window.innerWidth < 767){\r\n\/\/ \t\t\t  const tocs = document.querySelector('#toc.sticky');\r\n\t\t\t  tocTitle.textContent = 'Table of Content'; \/\/ Reset title\r\n       \t\t  toc.style.width = '150px'; \/\/ Set width to match the parent element\r\n\t\t  }\r\n      }\r\n      if (currentHeader) {\r\n\/\/         console.log(\"activeLink:\", activeLink);\r\n        if (activeLink) {\r\n\/\/           tocTitle.textContent = activeLink.textContent; \/\/ Update TOC title\r\n          tocTitle.textContent = activeLink ? activeLink.textContent : \"\"; \/\/ Update title only if activeLink exists\r\n        }\r\n      }\r\n    } else {\r\n      toc.classList.remove('sticky');\r\n      phtoc.style.display = \"none\";\r\n      toc.style.width = 'unset'; \/\/ Reset to original width\r\n      toc.style.backgroundColor = \"#FFF\";\r\n      tocTitle.textContent = 'Table of Content'; \/\/ Reset title\r\n\t\tpanel2.style.height = panel2.scrollHeight + \"px\";\r\n\t\ticon.style.transform = \"rotate(180deg)\";\r\n    }\r\n  }\r\n\r\n    \/\/ Attach the scroll event listener to the window\r\n    window.addEventListener('scroll', handleScroll);\r\n\r\n    \/\/ Initial call to handleScroll to set the correct state on load\r\n    handleScroll();\r\n});\r\n\t\r\n\t\/\/ Open toggle TOC\r\n\t  document.addEventListener(\"DOMContentLoaded\", function() {\r\n\t\tvar tocHeader = document.querySelector(\"#toc .header\");\r\n\t\tvar toc = document.querySelector(\"#toc\");\r\n\t\tvar icon = document.querySelector(\".toc-icon\");\r\n\t\tconst tocTitle = document.querySelector('#toc-title');\r\n\t\tconst tocs = document.querySelector('#toc.sticky');\r\n \t\tconst tocParent = toc.parentElement;\t\t  \r\n\r\n\t\t  tocHeader.addEventListener(\"click\", function() {\r\n\t\t\tvar panel = this.nextElementSibling;\r\n\t\t\tif (panel.style.height !== '0px') { \/\/ Check if height is not 0px\r\n\t\t\t  panel.style.height = '0px'; \/\/ Set height to 0 for full collapse\r\n\t\t\t  icon.style.transform = \"rotate(180deg)\";\r\n\/\/ \t\t\t\ttoc.style.paddingBottom = '6px'; \r\n\t\t\t\tif(window.innerWidth > 768){\r\n\t\t\t\t\tif(!toc.classList.contains('sticky')){\r\n\t\t\t\t\t\ttoc.style.width = \"unset\";\r\n\/\/ \t\t\t\t\t\ttoc.setAttribute('style', 'width: ' + tocParent.offsetWidth + 'px !important;');\r\n\t\t\t\t\t}\r\n\t\t\t\t\tif (toc.classList.contains('sticky')){\r\n\t\t\t\t\t\ttoc.style.width = '${tocParent.offsetWidth}px';\r\n\t\t\t\t\t\ttoc.setAttribute('style', 'width: ' + tocParent.offsetWidth + 'px !important;');\r\n\t\t\t\t\t}\r\n\t\t\t\t}\r\n\t\t\t\tif(window.innerWidth < 767){\r\n\t\t\t\t\ttoc.style.width = \"unset\"; \/\/ Reset width\r\n\t\t\t\t}\r\n\t\t\t\ttoc.style.backgroundColor = \"#FFF1F1\";\r\n\t\t\t} else {\r\n\t\t\t  panel.style.height = panel.scrollHeight + \"px\";\r\n\t\t\t  icon.style.transform = \"rotate(0deg)\";\r\n\t\t\t  toc.style.backgroundColor = \"#FFF\";\r\n\t\t\t  tocTitle.textContent = 'Table of Content'; \/\/ Reset title\r\n\t\t\t\ttoc.style.paddingBottom = '24px';\r\n\t\t\t \tif(window.innerWidth < 767){\r\n\t\t\t\t\ttoc.style.width = `${tocParent.offsetWidth}px`; \/\/ Set width to match the parent element\r\n\t\t\t\t\ttoc.setAttribute('style', 'width: ' + tocParent.offsetWidth + 'px !important;');\r\n\t\t\t\t}\r\n\t\t\t}\r\n\t\t  });\r\n\r\n\t\t  \/\/ Close TOC when a link inside it is clicked\r\n\t\t  var tocLinks = document.querySelectorAll(\"#toc .list a\");\r\n\t\t  tocLinks.forEach(function(link) {\r\n\t\t\tlink.addEventListener(\"click\", function() {\r\n\t\t\t  var panel = document.querySelector(\"#toc .list\");\r\n\t\t\t  panel.style.height = '0px'; \/\/ Set height to 0 for full collapse\r\n\t\t\t  icon.style.transform = \"rotate(180deg)\";\r\n\t\t\t  toc.style.backgroundColor = \"#FFF\";\r\n\t\t\t});\r\n\t\t  });\r\n\t\t});\r\n\r\n\r\n\r\n\t\r\n\/\/ \tmake the heading at the center of the viewport\r\n\/\/ \tdocument.addEventListener('DOMContentLoaded', function() {\r\n\/\/     \/\/ Add click event listener to all links in the TOC list\r\n\/\/     document.querySelectorAll('#toc-list a').forEach(anchor => {\r\n\/\/         anchor.addEventListener('click', function (e) {\r\n\/\/             e.preventDefault(); \/\/ Prevent the default behavior of jumping to the anchor\r\n\/\/ \/\/ \t\t\tconsole.log(\"prevent default\");\r\n\/\/             const targetId = this.getAttribute('href').substring(1); \/\/ Get the ID of the target element\r\n\/\/             const targetElement = document.getElementById(targetId); \/\/ Get the target element\r\n\r\n\/\/             if (targetElement) {\r\n\/\/                 const headerHeight = document.querySelector('#toc .header').offsetHeight; \/\/ Get the height of the fixed header\r\n\/\/                 const windowHeight = window.innerHeight; \/\/ Get the height of the viewport\r\n\/\/                 const targetOffset = targetElement.offsetTop; \/\/ Get the top offset of the target element\r\n\/\/                 const scrollTo = targetOffset + (windowHeight \/ 2) + (headerHeight); \/\/ Calculate the scroll position to center the target element\r\n\r\n\/\/                 \/\/ Scroll to the calculated position smoothly\r\n\/\/                 window.scrollTo({\r\n\/\/                     top: scrollTo,\r\n\/\/                     behavior: 'smooth'\r\n\/\/                 });\r\n\/\/             }\r\n\/\/         });\r\n\/\/     });\r\n\/\/ });\r\n<\/script>\r\n\r\n<!-- START script lama -->\r\n<!-- <script>\r\n\/\/ \tvar pilihDaftarIsi = document.getElementById('pilihDaftarIsi');\r\n\t\r\n\/\/ \tdocument.addEventListener('DOMContentLoaded', function() {\r\n\/\/ \t\tvar dropdownFixedTop = document.querySelector('.dropdown-fixed-top');\r\n\r\n\/\/ \t\tdropdownFixedTop.addEventListener('click', function() {\r\n\/\/ \t\t\tvar dropdownContent = this.querySelector('.list_toc');\r\n\/\/ \t\t\tdropdownContent.classList.toggle('show');\r\n\/\/ \t\t});\r\n\r\n\/\/ \t\twindow.addEventListener('click', function(event) {\r\n\/\/ \t\t\tvar listTocTop = document.getElementById('list_toc_top');\r\n\r\n\/\/ \t\t\tif (!dropdownFixedTop.contains(event.target)) {\r\n\/\/ \t\t\t\tlistTocTop.classList.remove('show');\r\n\/\/ \t\t\t}\r\n\/\/ \t\t});\r\n\/\/ \t});\r\n\t\r\n\/\/ \tvar daftarIsiContainer = document.getElementById('toc_group_article');\r\n\/\/ \tvar dropdownFixedTop = document.getElementById('dropdown-fixed-top');\r\n\/\/     var triggered = false; \/\/ Flag to keep track of whether the function has been triggered\r\n\r\n\/\/     window.addEventListener('scroll', function() {\r\n\/\/         if (!triggered && isCompletelyScrolledPast(daftarIsiContainer)) {\r\n\/\/             showSectionDropdownFixedTop(false);\r\n\/\/             triggered = true;\r\n\/\/         } else if (triggered && !isCompletelyScrolledPast(daftarIsiContainer)) {\r\n\/\/             showSectionDropdownFixedTop(true);\r\n\/\/             triggered = false;\r\n\/\/         }\r\n\/\/     });\r\n\r\n\/\/     function isCompletelyScrolledPast(element) {\r\n\/\/         var elementTop = element.getBoundingClientRect().top;\r\n\/\/         var elementBottom = element.getBoundingClientRect().bottom;\r\n\/\/         return elementTop < 0 && elementBottom < 0;\r\n\/\/     }\r\n\r\n\/\/     function showSectionDropdownFixedTop(show) {\r\n\/\/ \t\tif (show) {\r\n\/\/ \t\t\tdropdownFixedTop.classList.remove(\"show\");\r\n\/\/ \t\t} else {\r\n\/\/ \t\t\tdropdownFixedTop.classList.add(\"show\");\r\n\/\/ \t\t}\r\n\/\/     }\r\n<\/script> -->\r\n<!-- <script>\r\n    \/\/ Scrollspy function to highlight the active TOC item based on the scroll position\r\n  function scrollSpy(tocClass) {\r\n    const scrollPosition = window.scrollY;\r\n\r\n    \/\/ Find the active h2 and h3 headings based on their position in the corresponding TOC\r\n    let activeH2 = null;\r\n    let activeH3 = null;\r\n\r\n    const tocItems = document.querySelectorAll(`.${tocClass} li`);\r\n    tocItems.forEach(item => {\r\n      const a = item.querySelector('a');\r\n      if (!a) return;\r\n      const href = a.getAttribute('href');\r\n      const targetId = href.substring(1); \/\/ Remove the '#' from the href to get the target ID\r\n      const targetElement = document.getElementById(targetId);\r\n      if (!targetElement) return;\r\n\r\n      const targetTop = targetElement.getBoundingClientRect().top + scrollPosition;\r\n      const nextItem = item.nextElementSibling;\r\n      const nextTop = nextItem ? nextItem.getBoundingClientRect().top + scrollPosition : Infinity;\r\n\r\n      if (targetTop <= scrollPosition + 150) {\r\n        if (a.parentElement.parentElement === tocItems) {\r\n          \/\/ The h2 heading is at the root level of the TOC\r\n          activeH2 = { id: targetId, level: 'h2' };\r\n        } else {\r\n          \/\/ The h3 heading is nested under an h2 heading\r\n          const parentH2 = a.parentElement.parentElement.previousElementSibling;\r\n          if (parentH2) {\r\n            const h2Link = parentH2.querySelector('a');\r\n            if (h2Link) {\r\n              const h2Href = h2Link.getAttribute('href');\r\n              const h2Id = h2Href.substring(1);\r\n              activeH2 = { id: h2Id, level: 'h2' };\r\n            }\r\n          }\r\n          activeH3 = { id: targetId, level: 'h3' };\r\n        }\r\n      }\r\n\r\n      if (targetTop > scrollPosition + 150 && nextTop > scrollPosition + 150 && !activeH3) {\r\n        \/\/ Reset the activeH2 when there are no more active h3 headings\r\n        activeH2 = null;\r\n      }\r\n    });\r\n\r\n    \/\/ Update the active state for the TOC items\r\n    tocItems.forEach(item => {\r\n      item.classList.remove('active');\r\n      const a = item.querySelector('a');\r\n      if (a) {\r\n        const href = a.getAttribute('href');\r\n        const targetId = href.substring(1);\r\n        if ((activeH2 && activeH2.id === targetId) || (activeH3 && activeH3.id === targetId)) {\r\n          item.classList.add('active');\r\n\t\t  pilihDaftarIsi.innerHTML = a.textContent;\r\n        }\r\n      }\r\n    });\r\n  }\r\n\r\n  \/\/ Call scrollSpy for each TOC on window scroll\r\n  const tocClasses = ['list_toc', 'list_toc_float', 'list_toc_top']; \/\/ Add other TOC class names here if you have more than two instances\r\n  tocClasses.forEach(tocClass => {\r\n    window.addEventListener('scroll', () => scrollSpy(tocClass));\r\n  });\r\n<\/script> -->\r\n<!-- END script lama -->\r\n\t\r\n<script>\r\n    \/\/ Scrollspy function to highlight the active TOC item based on the scroll position\r\n  function scrollSpy(tocClass) {\r\n    const scrollPosition = window.scrollY;\r\n\r\n    \/\/ Find the active h2 and h3 headings based on their position in the corresponding TOC\r\n    let activeH2 = null;\r\n    let activeH3 = null;\r\n\r\n    const tocItems = document.querySelectorAll(`.${tocClass} li`);\r\n    tocItems.forEach(item => {\r\n      const a = item.querySelector('a');\r\n      if (!a) return;\r\n      const href = a.getAttribute('href');\r\n      const targetId = href.substring(1); \/\/ Remove the '#' from the href to get the target ID\r\n      const targetElement = document.getElementById(targetId);\r\n      if (!targetElement) return;\r\n\r\n      const targetTop = targetElement.getBoundingClientRect().top + scrollPosition;\r\n      const nextItem = item.nextElementSibling;\r\n      const nextTop = nextItem ? nextItem.getBoundingClientRect().top + scrollPosition : Infinity;\r\n\r\n      if (targetTop <= scrollPosition + 150) {\r\n        if (a.parentElement.parentElement === tocItems) {\r\n          \/\/ The h2 heading is at the root level of the TOC\r\n          activeH2 = { id: targetId, level: 'h2' };\r\n        } else {\r\n          \/\/ The h3 heading is nested under an h2 heading\r\n          const parentH2 = a.parentElement.parentElement.previousElementSibling;\r\n          if (parentH2) {\r\n            const h2Link = parentH2.querySelector('a');\r\n            if (h2Link) {\r\n              const h2Href = h2Link.getAttribute('href');\r\n              const h2Id = h2Href.substring(1);\r\n              activeH2 = { id: h2Id, level: 'h2' };\r\n            }\r\n          }\r\n          activeH3 = { id: targetId, level: 'h3' };\r\n        }\r\n      }\r\n\r\n      if (targetTop > scrollPosition + 150 && nextTop > scrollPosition + 150 && !activeH3) {\r\n        \/\/ Reset the activeH2 when there are no more active h3 headings\r\n        activeH2 = null;\r\n      }\r\n    });\r\n\r\n    \/\/ Update the active state for the TOC items\r\n    tocItems.forEach(item => {\r\n      item.classList.remove('active');\r\n      const a = item.querySelector('a');\r\n      if (a) {\r\n        const href = a.getAttribute('href');\r\n        const targetId = href.substring(1);\r\n        if ((activeH2 && activeH2.id === targetId) || (activeH3 && activeH3.id === targetId)) {\r\n          item.classList.add('active');\r\n        }\r\n      }\r\n    });\r\n  }\r\n\r\n  \/\/ Call scrollSpy for each TOC on window scroll\r\n  const tocClasses = ['list_toc', 'list_toc_float']; \/\/ Add other TOC class names here if you have more than two instances\r\n  tocClasses.forEach(tocClass => {\r\n    window.addEventListener('scroll', () => scrollSpy(tocClass));\r\n  });\r\n<\/script>\r\n\t\r\n\r\n<!-- ToC List for desktop side bar, diganti jadi inject by php, di code snippet \"Sidebar Accordion\" -->\r\n<!--  <script>\r\n\tdocument.addEventListener(\"DOMContentLoaded\", function() {\r\nToC List for desktop side bar, diganti jadi inject by php, di code snippet \"Sidebar Accordion\"\r\n        Fungsi untuk mengubah teks menjadi format id\r\n        function formatId(text) {\r\n            return text.trim().replace(\/[^\\w\\d]+\/g, '_');\r\n        }\r\n\r\n        \/\/ Fungsi untuk membuat nested list\r\n        function createNestedList(parentNode, children) {\r\n            if (children.length === 0) return;\r\n\r\n            const nestedUl = document.createElement('ul');\r\n            children.forEach(child => {\r\n                const nestedLi = document.createElement('li');\r\n                const nestedA = document.createElement('a');\r\n                nestedA.textContent = child.title;\r\n                nestedA.href = `#${child.id}`;\r\n                nestedLi.appendChild(nestedA);\r\n                nestedUl.appendChild(nestedLi);\r\n\r\n                if (child.children.length > 0) {\r\n                    createNestedList(nestedLi, child.children);\r\n                }\r\n            });\r\n\r\n            parentNode.appendChild(nestedUl);\r\n        }\r\n\r\n        \/\/ Membuat objek untuk menyimpan daftar h2 dan h3 beserta judulnya\r\n        const headings = [];\r\n\r\n           \/\/ Mengambil semua elemen h2 dan h3\r\n        const elements = document.querySelectorAll('.td-post-content h2');\r\n\t\t\t\/\/, .td-post-content h3\r\n\r\n        elements.forEach(element => {\r\n            if (element.tagName === 'H2') {\r\n                const id = formatId(element.textContent);\r\n                element.id = id;\r\n\t\t\t\tif (element.textContent.toLowerCase() === \"key takeaways\") {return;} \/\/ Kalau Key Takeaways, jangan dimasukin\r\n                headings.push({ level: 'h2', id: id, title: element.textContent, children: [] });\r\n            } else if (element.tagName === 'H3') {\r\n                const id = formatId(element.textContent);\r\n                element.id = id;\r\n                if (headings.length > 0) {\r\n                    headings[headings.length - 1].children.push({ level: 'h3', id: id, title: element.textContent, children: [] });\r\n                }\r\n            }\r\n        });\r\n\r\n        \/\/ Membuat list HTML dari objek headings\r\n        const ul = document.getElementById('list_toc');\r\n        let currentUl = ul;\r\n        headings.forEach(heading => {\r\n            const li = document.createElement('li');\r\n            const a = document.createElement('a');\r\n            a.textContent = heading.title;\r\n            a.href = `#${heading.id}`;\r\n            li.appendChild(a);\r\n\r\n            if (heading.level === 'h2') {\r\n                \/\/ Menyimpan ul saat ini untuk menambahkan nested ul\r\n                currentUl = li;\r\n                ul.appendChild(li);\r\n            } else if (heading.level === 'h3') {\r\n                if (!currentUl.lastElementChild || currentUl.lastElementChild.tagName !== 'UL') {\r\n                    \/\/ Jika belum ada nested ul, buat satu\r\n                    const nestedUl = document.createElement('ul');\r\n                    currentUl.appendChild(nestedUl);\r\n                    currentUl = nestedUl;\r\n                }\r\n                currentUl.appendChild(li);\r\n            }\r\n\r\n            createNestedList(li, heading.children);\r\n        });\r\n\t\tDapatkan elemen ul dengan id 'list_toc_float'\r\nconst ulFloat = document.getElementById('list_toc');\r\nconst ulJourney = document.getElementById('list_journey');\r\n\r\nDapatkan isi (child elements) dari ul dengan id 'list_toc_float'\r\n\tif (ulFloat !== null) {\r\n\t\tconst clonedChildren = ulFloat.cloneNode(true).children;\r\n\t\tconst ulToc = document.getElementById('list_toc_float');\r\n\t\tconst ulTocTop = document.getElementById('list_toc_top');\r\n\t\tif ((ulToc !== null || ulToc !== undefined) && window.innerWidth > 1018){\r\n\t\t\tulToc.append(...clonedChildren);\r\n\t\t} else {\r\n\t\t\tulTocTop.append(...clonedChildren);\r\n\t\t}\r\n\t} \r\n\r\n\tif (ulJourney !== null) {\r\n\t\tconst clonedChildrenJourney = ulJourney.cloneNode(true).children;\r\n\t\tconst ulTocJourney = document.getElementById('list_toc_journey');\r\n\t\tulTocJourney.append(...clonedChildrenJourney);\r\n\t} \r\n\t\r\n        Fungsi untuk mengambil tinggi navbar\r\n        function getNavbarHeight() {\r\n            const navbar = document.getElementById('tdi_34');\r\n            return navbar ? navbar.offsetHeight : 0;\r\n        }\r\n\r\n        \/\/ Fungsi untuk menambahkan offset posisi scroll\r\n        function scrollToElementWithOffset(elementId) {\r\n            const element = document.getElementById(elementId);\r\n            if (element) {\r\n                const offset = getNavbarHeight();\r\n                const elementPosition = element.getBoundingClientRect().top;\r\n                const offsetPosition = elementPosition - offset-40;\r\n\r\n                window.scrollBy({\r\n                    top: offsetPosition,\r\n                    behavior: 'smooth'\r\n                });\r\n            }\r\n        }\r\n\r\n        \/\/ Fungsi untuk menangani klik pada tautan judul\r\n        function handleTitleClick(event) {\r\n            event.preventDefault();\r\n            const href = event.target.getAttribute('href').substr(1);\r\n            scrollToElementWithOffset(href);\r\n        }\r\n\r\n        \/\/ Tambahkan event listener untuk semua tautan judul\r\n        const titleLinks = document.querySelectorAll('a[href^=\"#\"]');\r\n        titleLinks.forEach(link => {\r\n            link.addEventListener('click', handleTitleClick);\r\n        });\r\n\t});\r\n    <\/script> -->\r\n<\/p>\n<h2 id=\"1\"><b>Aspects of Construction Management<\/b><\/h2>\n<p><span style=\"font-weight: 400;\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-50698 size-full\" style=\"font-family: Verdana, BlinkMacSystemFont, -apple-system, 'segoe ui', Roboto, Oxygen, Ubuntu, Cantarell, 'open sans', 'helvetica neue', sans-serif;\" src=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-scaled.jpg\" alt=\"software for construction\" width=\"2048\" height=\"1109\" srcset=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-scaled.jpg 2048w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-300x163.jpg 300w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-1024x555.jpg 1024w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-768x416.jpg 768w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-1536x832.jpg 1536w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-150x81.jpg 150w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-696x377.jpg 696w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-1068x579.jpg 1068w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-2-1920x1040.jpg 1920w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/>Like any other industry, there are some aspects that you need to underline to meet your client\u2019s expectations. Some of them need special handling and will be done easier with <\/span><a href=\"https:\/\/www.hashmicro.com\/hash-construction-software\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">construction software<\/span><\/a><span style=\"font-weight: 400;\">. Here are the aspects of construction management.<\/span><\/p>\n<h3 id=\"a\"><span style=\"font-weight: 400;\">Planning phase<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Planning phase is one of the most important aspects. This includes every step needed before you can start the project. Such as obtaining <a href=\"https:\/\/lkyspp.nus.edu.sg\/docs\/default-source\/ips\/pa_mt_managing-international-migration-for-development-in-east-asia-research-papers_240215.pdf\" target=\"_blank\" rel=\"noopener\">permits<\/a>, calculating costs, optimizing <\/span><span style=\"font-weight: 400;\">resource<\/span><span style=\"font-weight: 400;\"> use, and initial designing. By all means, the planning team needs to give the objectives and goals of the project.\u00a0<\/span><\/p>\n<h3 id=\"b\"><span style=\"font-weight: 400;\">Job scheduling<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">This aspect will require you to estimate how much time is needed to complete the project. Job scheduling in construction is known for demanding knowledge about the resources that will be used. Excellent knowledge and estimation will make the process more efficient.\u00a0<\/span><\/p>\n<h3 id=\"c\"><span style=\"font-weight: 400;\">Organizing necessary resources<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">You need to organize resources accordingly. It involves dividing projects into departments, assigning tasks to employees, and making a procedure to guide employees. Managers need to make sure that every individual is assigned to the right jobs. purchasing materials. This also includes purchasing and locating necessary materials.<\/span><\/p>\n<h3 id=\"d\"><span style=\"font-weight: 400;\">Worker directing<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Directing workers refers to how construction managers help employees to achieve their given tasks correctly. Managers should give trainings, correct, and support employees during the process. It will prevent unwanted errors and directing are helpful for the employees to give an excellent outcome.\u00a0<\/span><\/p>\n<h3 id=\"e\"><span style=\"font-weight: 400;\">Construction process control<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The next aspect is the controlling process. Controlling is crucial to maintaining the construction timeline, avoiding increasing costs, and satisfying clients with the result. This aspect involves comparing the initial plans with ongoing achievements. They also need to make adjustments to meet the objectives and deadlines.\u00a0<\/span><\/p>\n<h3 id=\"f\"><span style=\"font-weight: 400;\">Construction process coordination<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Good <\/span><span style=\"font-weight: 400;\">coordination<\/span><span style=\"font-weight: 400;\"> is the key to a successful project. Companies often fail to complete projects due to poor coordination. It is essential to ensure every individual involved has good communication. Managers also need to make sure that employees understand their roles well. Thus, completing any projects will be easier.\u00a0<\/span><\/p>\n<style>\r\n.cta-in-article-image .desktop-banner{\r\n    display: none;\r\n    text-align: center;\r\n}\r\n.cta-in-article-image .desktop-mobile{\r\n    display: block;\r\n    text-align: center;\r\n    width: 100%;\r\n}\r\n@media (min-width: 650px) {\r\n    .cta-in-article-image .desktop-banner {\r\n        display: block!important;\r\n    }\r\n}\r\n@media (min-width: 650px) {\r\n   .cta-in-article-image .desktop-mobile {\r\n        display: none!important;\r\n    }\r\n}\r\n<\/style>\r\n<div class=\"cta-in-article-image\">\r\n\t<a href=\"https:\/\/www.hashmicro.com\/grants?utm_source=blog&medium=banner-article\" target=\"_blank\" rel=\"noopener\">\r\n\t\t<div id=\"desktop-banner-container\">\r\n\t\t\t<div class=\"desktop-banner\">\r\n<!-- \tnew CTC Grants Banner\t\t -->\r\n\t\t\t\t<img decoding=\"async\" width='696' height='189' src=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2025\/07\/CTC-Grants-scaled.webp\" alt=\"download skema harga software erp\">\r\n\t\t\t<\/div>\r\n\t\t<\/div>\r\n\t\t<div id=\"mobile-banner-container\">\r\n\t\t\t<div class=\"desktop-mobile\">\r\n\t\t\t\t<img decoding=\"async\" width='450' height='497' src=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2023\/11\/EDG-Banner-Mobile.png.webp\" alt=\"download skema harga software erp\">\r\n\t\t\t<\/div>\r\n\t\t<\/div>\r\n\t<\/a>\r\n<\/div>\r\n\r\n\r\n\n<h2 id=\"2\"><b>5 Major Issues in Constructions Project<\/b><\/h2>\n<p><span style=\"font-weight: 400;\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-50699 size-full\" style=\"font-family: Verdana, BlinkMacSystemFont, -apple-system, 'segoe ui', Roboto, Oxygen, Ubuntu, Cantarell, 'open sans', 'helvetica neue', sans-serif;\" src=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-scaled.jpg\" alt=\"software for construction\" width=\"2048\" height=\"1109\" srcset=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-scaled.jpg 2048w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-300x163.jpg 300w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-1024x555.jpg 1024w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-768x416.jpg 768w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-1536x832.jpg 1536w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-150x81.jpg 150w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-696x377.jpg 696w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-1068x579.jpg 1068w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-3-1920x1040.jpg 1920w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/>Managing construction projects can be very difficult sometimes. There are many possible issues that may occur while doing the projects. Here are 5 major issues that companies usually stumble at.<\/span><\/p>\n<h3 id=\"g\"><span style=\"font-weight: 400;\">Regulation compliance<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Several regulations are changing due to keeping up with the latest technology. It is hard for companies to keep up with the constant changes especially when they\u2019re handling several projects. Some updates and messages could go unnoticed which will affect the project thoroughly. It is necessary to have a place where you can manage them easier.<\/span><\/p>\n<h3 id=\"h\"><span style=\"font-weight: 400;\">Keeping up with schedule<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">It is not unusual for companies to make errors while scheduling manually. A miss in schedule could affect the entire schedule and cause disadvantages. To avoid human errors, companies can utilize system<\/span><span style=\"font-weight: 400;\"> that will automate scheduling. This way, it will boost productivity, and keeping up with schedules will be a lot easier.<\/span><\/p>\n<h3 id=\"i\"><span style=\"font-weight: 400;\">Slow technology adoption<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Many construction companies have trouble adapting to the newest technology. It almost seems like they neglect the wonders of technology. Even though companies acknowledge how technologies could help them, it is mostly caused by relatively small budgets. This remains a problem for several years.\u00a0<\/span><\/p>\n<h3 id=\"j\"><span style=\"font-weight: 400;\">Problem to communicate<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Communication is notable for any business. Surprisingly, companies are failing to meet their objectives and goals often due to very poor communication. Without communication, important tasks can be missed and be unaware of. This one is also quite a problem that causes major failure.\u00a0<\/span><\/p>\n<h3 id=\"k\"><span style=\"font-weight: 400;\">Document management<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Dealing with tons of documents can be stressful, especially in the construction industry. Moreover, if it&#8217;s still done manually it could slow the operational process. Companies these days should apply a paperless working style. There are plenty of <\/span><span style=\"font-weight: 400;\">construction management system <\/span><span style=\"font-weight: 400;\">that could help you manage your documents<\/span><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 700 !important;\">Also read:<\/span>\u00a0\u00a0<a href=\"https:\/\/www.hashmicro.com\/blog\/the-importance-of-erp-system-for-your-construction-project-company\/\" target=\"_blank\" rel=\"noopener\">Why ERP System Is Important for Your Construction Project<\/a><\/p>\n<h2 id=\"3\"><b>5 Software to Solve Construction Problems<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">With all of those complicated phases and issues, you can always utilize <a href=\"https:\/\/www.hashmicro.com\/hash-construction-software\">construction softwares<\/a> to help you. Here you will find some of the best software for your project that will simplify the whole management process.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">HashMicro construction suite<\/span><\/h3>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-20410 size-full\" src=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/sect-1rev-concrete.png\" alt=\"HashMicro Construction Management Software to help your projects\" width=\"1065\" height=\"600\" srcset=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/sect-1rev-concrete.png 1065w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/sect-1rev-concrete-300x169.png 300w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/sect-1rev-concrete-1024x577.png 1024w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/sect-1rev-concrete-768x433.png 768w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/sect-1rev-concrete-150x85.png 150w, https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/sect-1rev-concrete-696x392.png 696w\" sizes=\"auto, (max-width: 1065px) 100vw, 1065px\" \/><\/p>\n<p><a href=\"https:\/\/www.hashmicro.com\/hash-construction-software\">HashMicro Construction System<\/a> automates your entire project workflow, from bidding and budgeting to reporting and inventory management optimization. Powered by cloud technology and AI, it streamlines operations for a smoother process.<\/p>\n<p>What sets HashMicro\u2019s construction software apart is its customizability, allowing you to tailor it to your company\u2019s specific needs. By adopting this advanced solution, you can significantly boost project productivity, minimize human errors, prevent budget overruns, and save valuable time.<\/p>\n<h3><span style=\"font-weight: 400;\">Wrike<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">The next software you need to know is Wrike. Wrike\u2019s management software allows you to turbocharge projects that will save you time. This way, you can focus on what matters the most. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you have multiple projects ongoing, this software will also help you easily monitor any details so high profitability is ensured. Wrike also has various resources to empower the employees such as case studies and eBooks. For more information, you can check this Wrike alternative.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Visual planning<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Visual Planning specialize in scheduling and tracking. It helps companies to improve productivity through its in-depth management system regardless of the company size. Managers are able to remotely access any information from the work site. With a good scheduling system, managers and on-site teams can easily track any process.\u00a0<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">EZOfficeInventory<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">If you\u2019re looking for great asset-tracking software for your construction projects, EZOfficeInventory is your answer. This software will track, maintain, and report your equipment. EZOfficeInventory will simplify complicated workflow thus you will have better management for your inventory. It also allows employees to find the right tools that will increase productivity.\u00a0<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">COINS<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">COINS is a construction-focused ERP system. It provides you a real-time information that you can access anywhere and anytime. They will also make complex reports faster to improve performance and business insight. COINS system allows you to integrate your whole team to communicate better.<\/span><\/p>\n<h2 id=\"4\"><b>Conclusion\u00a0<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Construction means the process to build something. Just for a project, there are so much to consider in the process. Such as planning, and budgeting, until seeing the results. Succeeding a construction project requires a huge effort. It also depends on whether the companies are able to meet the key aspects and if they\u2019re capable of solving major issues. The good news, multiple softwares could help you successing your projects. HashMicro&#8217;s <\/span><a href=\"https:\/\/www.hashmicro.com\/hash-construction-software\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">construction software<\/span><\/a><span style=\"font-weight: 400;\"> is surely the one you\u2019re looking for.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">HashMicro\u2019s Hash Construction Suite<\/span><span style=\"font-weight: 400;\"> is the best management software you could utilize. It is an AI-powered software, is affordable, and has various features to help you solve any construction related problems. All of the operational process will be automated thus minimizing human errors. HashMicro will assist your project from A to Z and of course, with an excellent outcome. This way, you totally could expect a greater result from using <\/span><span style=\"font-weight: 400;\">HashMicro\u2019s management software<\/span><span style=\"font-weight: 400;\">. Managing a construction project could be a challenge, but HashMicro would gladly accompany your journey. If you are interested, <a href=\"https:\/\/www.hashmicro.com\/free-product-tour\/\">click here<\/a> to try the free demo!<\/span><\/p>\n<p>Construction involves the intricate process of building something, where each project demands careful planning, budgeting, and execution to achieve successful results. Managing a construction project is no small feat, requiring companies to meet key objectives and tackle significant challenges. Fortunately, advanced software solutions can greatly enhance your chances of success. <a href=\"https:\/\/www.hashmicro.com\/hash-construction-software\">HashMicro&#8217;s Construction Software<\/a> is precisely what you need.<\/p>\n<p>Hash Construction Suite by HashMicro is an AI-powered, affordable solution designed to address all your construction management needs. With a wide array of features, it automates every aspect of the operational process, drastically reducing human error. From start to finish, HashMicro ensures your project runs smoothly, delivering outstanding results. By leveraging this powerful tool, you can expect to see significantly improved outcomes.<\/p>\n<p>Managing a construction project can be challenging, but with HashMicro by your side, you&#8217;re set for success. Ready to elevate your project management? Click here to try the <a href=\"https:\/\/www.hashmicro.com\/free-product-tour\/\">free demo<\/a> and experience the difference!<\/p>\n<a href=\"https:\/\/www.hashmicro.com\/hash-construction-software?medium=moneysite-banner\" target=\"_blank\"><img decoding=\"async\" loading=\"lazy\" width=\"712\" src=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2025\/06\/Construction.webp\" alt=\"Hash Construction Suite\"><\/a>\n","protected":false},"excerpt":{"rendered":"<p>Construction derives from the word \u2018construct\u2019. It means \u2018to build\u2019. Thus, construction refers to the process of building something. Meanwhile, in the engineering term, it is often associated with large structures such as buildings, highways, and houses. Every construction project requires a complicated process which causes companies to struggle to achieve it. Managers are often [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":50697,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[1785,588,23],"class_list":{"0":"post-20406","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"tag-construction","9":"tag-construction-erp","10":"tag-construction-management-software"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.6 (Yoast SEO v26.6) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Common Construction Problems and How Software Can Help<\/title>\n<meta name=\"description\" content=\"Construction project requires a lot of consideration. These 5 software for construction could help you simplify your construction project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Common Construction Management Problems and How Software Can Help\" \/>\n<meta property=\"og:description\" content=\"Construction project requires a lot of consideration. These 5 software for construction could help you simplify your construction project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/\" \/>\n<meta property=\"og:site_name\" content=\"BusinessTech\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/web.facebook.com\/hashmicro\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-08-30T03:42:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-20T07:32:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1109\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hashmicro\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@hashmicro\" \/>\n<meta name=\"twitter:site\" content=\"@hashmicro\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hashmicro\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/\"},\"author\":{\"name\":\"Hashmicro\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#\/schema\/person\/c20b6fe2acc952edbc2a9ec5280f4bae\"},\"headline\":\"Common Construction Management Problems and How Software Can Help\",\"datePublished\":\"2022-08-30T03:42:27+00:00\",\"dateModified\":\"2025-11-20T07:32:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/\"},\"wordCount\":1561,\"publisher\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg\",\"keywords\":[\"construction\",\"construction erp\",\"construction management software\"],\"articleSection\":[\"Construction\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/\",\"url\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/\",\"name\":\"Common Construction Problems and How Software Can Help\",\"isPartOf\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg\",\"datePublished\":\"2022-08-30T03:42:27+00:00\",\"dateModified\":\"2025-11-20T07:32:44+00:00\",\"description\":\"Construction project requires a lot of consideration. These 5 software for construction could help you simplify your construction project.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#primaryimage\",\"url\":\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg\",\"contentUrl\":\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg\",\"width\":2048,\"height\":1109,\"caption\":\"software for construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.hashmicro.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Common Construction Management Problems and How Software Can Help\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#website\",\"url\":\"https:\/\/www.hashmicro.com\/blog\/\",\"name\":\"BusinessTech\",\"description\":\"Business Management Blog\",\"publisher\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.hashmicro.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#organization\",\"name\":\"HashMicro\",\"url\":\"https:\/\/www.hashmicro.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2016\/02\/bt_logo-1.png\",\"contentUrl\":\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2016\/02\/bt_logo-1.png\",\"width\":334,\"height\":51,\"caption\":\"HashMicro\"},\"image\":{\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/web.facebook.com\/hashmicro\/\",\"https:\/\/x.com\/hashmicro\",\"https:\/\/www.linkedin.com\/company\/hashmicro\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#\/schema\/person\/c20b6fe2acc952edbc2a9ec5280f4bae\",\"name\":\"Hashmicro\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.hashmicro.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2023\/02\/cropped-DALL\u00b7E-2023-02-14-13.37.16-photo-of-asian-looking-young-woman-1-1-96x96.png\",\"contentUrl\":\"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2023\/02\/cropped-DALL\u00b7E-2023-02-14-13.37.16-photo-of-asian-looking-young-woman-1-1-96x96.png\",\"caption\":\"Hashmicro\"},\"description\":\"HashMicro is a software development and enterprise resource planning (ERP) company. Consequently, we often provide articles about ERP and other systems that all businesses need.\",\"url\":\"https:\/\/www.hashmicro.com\/blog\/author\/admin_hashmicro\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Common Construction Problems and How Software Can Help","description":"Construction project requires a lot of consideration. These 5 software for construction could help you simplify your construction project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/","og_locale":"en_US","og_type":"article","og_title":"Common Construction Management Problems and How Software Can Help","og_description":"Construction project requires a lot of consideration. These 5 software for construction could help you simplify your construction project.","og_url":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/","og_site_name":"BusinessTech","article_publisher":"https:\/\/web.facebook.com\/hashmicro\/","article_published_time":"2022-08-30T03:42:27+00:00","article_modified_time":"2025-11-20T07:32:44+00:00","og_image":[{"width":2048,"height":1109,"url":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg","type":"image\/jpeg"}],"author":"Hashmicro","twitter_card":"summary_large_image","twitter_creator":"@hashmicro","twitter_site":"@hashmicro","twitter_misc":{"Written by":"Hashmicro","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#article","isPartOf":{"@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/"},"author":{"name":"Hashmicro","@id":"https:\/\/www.hashmicro.com\/blog\/#\/schema\/person\/c20b6fe2acc952edbc2a9ec5280f4bae"},"headline":"Common Construction Management Problems and How Software Can Help","datePublished":"2022-08-30T03:42:27+00:00","dateModified":"2025-11-20T07:32:44+00:00","mainEntityOfPage":{"@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/"},"wordCount":1561,"publisher":{"@id":"https:\/\/www.hashmicro.com\/blog\/#organization"},"image":{"@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg","keywords":["construction","construction erp","construction management software"],"articleSection":["Construction"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/","url":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/","name":"Common Construction Problems and How Software Can Help","isPartOf":{"@id":"https:\/\/www.hashmicro.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#primaryimage"},"image":{"@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#primaryimage"},"thumbnailUrl":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg","datePublished":"2022-08-30T03:42:27+00:00","dateModified":"2025-11-20T07:32:44+00:00","description":"Construction project requires a lot of consideration. These 5 software for construction could help you simplify your construction project.","breadcrumb":{"@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#primaryimage","url":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg","contentUrl":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2022\/08\/software-for-construction-scaled.jpg","width":2048,"height":1109,"caption":"software for construction"},{"@type":"BreadcrumbList","@id":"https:\/\/www.hashmicro.com\/blog\/common-construction-problems-and-how-software-can-help\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.hashmicro.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Common Construction Management Problems and How Software Can Help"}]},{"@type":"WebSite","@id":"https:\/\/www.hashmicro.com\/blog\/#website","url":"https:\/\/www.hashmicro.com\/blog\/","name":"BusinessTech","description":"Business Management Blog","publisher":{"@id":"https:\/\/www.hashmicro.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.hashmicro.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.hashmicro.com\/blog\/#organization","name":"HashMicro","url":"https:\/\/www.hashmicro.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.hashmicro.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2016\/02\/bt_logo-1.png","contentUrl":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2016\/02\/bt_logo-1.png","width":334,"height":51,"caption":"HashMicro"},"image":{"@id":"https:\/\/www.hashmicro.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/web.facebook.com\/hashmicro\/","https:\/\/x.com\/hashmicro","https:\/\/www.linkedin.com\/company\/hashmicro"]},{"@type":"Person","@id":"https:\/\/www.hashmicro.com\/blog\/#\/schema\/person\/c20b6fe2acc952edbc2a9ec5280f4bae","name":"Hashmicro","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.hashmicro.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2023\/02\/cropped-DALL\u00b7E-2023-02-14-13.37.16-photo-of-asian-looking-young-woman-1-1-96x96.png","contentUrl":"https:\/\/www.hashmicro.com\/blog\/wp-content\/uploads\/2023\/02\/cropped-DALL\u00b7E-2023-02-14-13.37.16-photo-of-asian-looking-young-woman-1-1-96x96.png","caption":"Hashmicro"},"description":"HashMicro is a software development and enterprise resource planning (ERP) company. Consequently, we often provide articles about ERP and other systems that all businesses need.","url":"https:\/\/www.hashmicro.com\/blog\/author\/admin_hashmicro\/"}]}},"order_j":"","_links":{"self":[{"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/posts\/20406","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/comments?post=20406"}],"version-history":[{"count":27,"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/posts\/20406\/revisions"}],"predecessor-version":[{"id":76445,"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/posts\/20406\/revisions\/76445"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/media\/50697"}],"wp:attachment":[{"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/media?parent=20406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/categories?post=20406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.hashmicro.com\/blog\/wp-json\/wp\/v2\/tags?post=20406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}